Full operations were restored on May 29 at the World Trade Bridge between Nuevo Laredo, Mexico and Laredo, Texas. Border-crossing operations were temporarily suspended after a May 21 storm had caused severe flooding, power outages and wind damage. Truck traffic had been rerouted to Laredo’s Colombia Solidarity International Bridge. During normal operations, the World Trade Bridge location processes 12,000 trucks per day.
This document is CONFIDENTIAL and contains PROPRIETARY information. It is solely for the use of the recipient. Any further review, disclosure, copying, dissemination, distribution, or use of any of the information contained in this document is strictly prohibited. The recipient shall be liable for damages resulting from any disclosure of this information to any third party. ©2017 Trans American Companies.